Sirius Academy

Specification of Work: Cycle Storage

Client: Sirius Academy

Location: Hull

Value: £2,929

Duration: 3/4 weeks

Project Introduction

Miko Engineering often work with schools and councils to help solve engineering needs.

One example of this would be when we worked with Sirius Academy in Hull to design and create two cycle compounds. More and more schools are now encouraging a healthy lifestyle among students and building cycle compounds allows the students to store their bikes in a safe place. The cycle compound was made to BREEAM standard.

Sirius Academy

What Was Done

The cycle compound is able to store 360 bikes which showcase that there really is no job too small or too large for Miko Engineering to solve.

If your school or office building is looking for cycle compounds then please do not hesitate to email sales@mikoengineering.co.uk or call us on 0191 428 0452.

Get Your Free Site Survey Today

Head over to our contact page to submit your request. We aim to get out to your site within 5 working days.

Request a Call Back

Or Contact Us Directly

Connect with us


    I accept the privacy policy

    Related Case Studies