menu close icon

Seaton Sluice First School

Specification of Work: Playground Canopy

Client: Seaton Sluice First School

Location: Seaton Sluice

Value: £9,577

Duration: 4 weeks

Project Introduction

The bespoke playground canopy we manufactured and installed at Sluice Sluice First School covers an area of 50m2, providing a much-needed sheltered area for the winter months to come. The two-tone powder coated finish matches the school colours and brings a fresh look to the playground.

Client Testimonial

Amanda Bennett – Headteacher at Seaton Sluice First School – “we are absolutely THRILLED with our brand new 10m by 5m outdoor shelter! Now we can enjoy being outdoors for longer with our learning, playing, singing and hopefully have some class assemblies too! Fantastic work by Miko Engineering. Thanks, you so much!”

Get Your Free Site Survey Today

Head over to our contact page to submit your request. We aim to get out to your site within 5 working days.

Request a Call Back

Or Contact Us Directly

Connect with us


    I accept the privacy policy

    Related Case Studies