menu close icon

Abingdon Primary School

Specification of Work: Entrance Canopy

Client: Abingdon Primary School

Location: Middlesbrough

Value: £17,500

Duration: 4 weeks

Project Introduction

Miko Engineering regularly work with schools for a range of engineering needs including cycle shelters, entrance canopies and bespoke designs for playgrounds.

abingdon primary school

Project Brief / Background

At Abingdon Primary School in Middlesbrough, they were looking to improve the entrance to the school building.

What Was Done

Miko Engineering designed an entrance canopy that fitted in with the school. They did this through using the same colour red to improve brand identity of the school.

The entrance canopy has also offered protection from the elements which has improved the functionality of the school entrance.

If you are thinking about building an entrance canopy at your school or office then why not email Miko Engineering on sales@mikoengineering.co.uk or call us on 0191 428 0452.

Get Your Free Site Survey Today

Head over to our contact page to submit your request. We aim to get out to your site within 5 working days.

Request a Call Back

Or Contact Us Directly

Connect with us


    I accept the privacy policy

    Related Case Studies